Serving Madera, Fresno & the Central Valley
jplacencia@jdpplumbingservice.com CSLB #1160476 — C-36 Plumbing — Licensed & Insured
01 — Residential

Residential New Construction

Full rough-in through finish for single-family tracts, custom homes, and infill lots — sized to your framing schedule, lot by lot.

  • Underground DWV and water service before slab pour
  • Wall and ceiling rough-in coordinated with framing sign-off
  • Gas line rough-in for range, dryer, and water heater
  • Top-out and pressure testing ahead of inspection
  • Multi-lot crews scaled to tract phasing
Underground water line rough-in before slab pour on a JDP Plumbing project
02 — Commercial

Commercial New Construction

Ground-up and tenant-improvement plumbing for offices, retail suites, and light commercial buildings — laid out to match your MEP set.

  • Restroom core and break-room rough-in for TI build-outs
  • Coordination with HVAC and electrical to avoid conflicts
  • Grease waste and floor drain layout for retail/food spaces
  • Domestic water and sanitary mains from point of connection
  • Scheduling built around your general contractor's critical path
Commercial building foundation under construction with rebar
03 — Finish Work

Fixture & Finish Installation

The final-stage work that gets a unit to a clean walkthrough — set, connected, tested, and photographed.

  • Tub, shower, and sink set with trim and hardware
  • Water heater installation — tank
  • Gas appliance hookups: range, dryer, water heater
  • Fixture testing and punch-list walkthrough with super
  • Move-in ready sign-off, unit by unit
Finished stainless steel kitchen sink and faucet installed by JDP Plumbing
04 — Planning

Plan Review & Layout

Before a single pipe goes in, we read the full plan set and lay out DWV and supply runs to match code and the architect's intent.

  • Plan set review across plumbing, framing, and MEP sheets
  • Conflict flagging before rough-in begins
  • Fixture-unit sizing and vent layout to code
  • Bid breakdown by phase: rough-in, top-out, trim
  • Pre-inspection walk of every rough-in before cover
Copper and ABS rough-in plumbing laid out in a wall before drywall
05 — Re-Pipes

Whole-Home & Commercial Re-Pipes

Replacing old, failing, or leak-prone pipe in existing homes and buildings — new supply lines run clean, tested, and patched back up.

  • Full water-line re-pipes in copper or PEX
  • Replacement of galvanized, polybutylene, or corroded lines
  • Repiping to fix low pressure, leaks, and recurring failures
  • Pressure testing and inspection sign-off
  • Drywall access cut and patched back on completion
PEX manifold and new water lines run during a JDP Plumbing re-pipe
06 — Sewer

Main Sewer Line Replacement

Full replacement of failing, collapsed, or root-damaged sewer laterals — from cleanout to the point of connection, done right the first time.

  • Excavation and full replacement of the main sewer line
  • Replacement of cracked, offset, bellied, or root-intruded pipe
  • New cleanouts set to code for future access
  • Camera inspection and pressure/flow testing before backfill
  • Trench backfill and site restoration on completion
Underground utility trench for a sewer line replacement on a JDP Plumbing project
Not Sure Where Your Project Fits?

Send the plan set. We'll tell you the scope.

Request a Bid